Review of Industrial Engineering Letters 2409-2169 2408-9427 10.18488/journal.71/2018.42.21.35 Review of Industrial Engineering Letters Applying Building Information Modelling Plus-the Practice of Shanghai Shipping Service Complex Review of Industrial Engineering Letters Review of Industrial Engineering Letters 06-2018 2018 06-2018 06-2018 4 2 21 35 29 Jun 2018 05 Oct 2018 Taking advantage of Building Information Model (BIM) to integrate multi-dimensional information, such as time and space information can provide robust guidance for design, construction and operation management, which can produce strong technical support for improving project management. Based on the BIM+ theory and the ship lock construction in Shanghai Shipping Service Complex (SSSC), this paper formulates the stages and contents of the application of BIM technology. Through the implementation of BIM in the planning, design, construction and maintenance of ship lock engineering, the management of the whole life cycle of the project are realised. The application of BIM+ theory in SSSC lock engineering is explored effectively by 3D printing technology combined with Internet technology..